| Company's Name |
Location (County) |
Date Well was Completed |
Formation |
Well's Name |
Treated Interval |
Cased or Open-hole
(O-H) |
Rate Prior to Treatment |
Date it was treated |
|
|
Rate After Treatment |
Notes |
| BOPD |
Rate MCFD |
Prior BWPD |
|
|
BOPD |
MCFD |
BWPD |
| |
| USA |
| RMOTC |
Natrona,
WY |
1978 |
Wall Creek-2 |
Teapot Dome 85-AX-10 |
3,014'-3,031' |
Cased |
2.2 |
227 |
2.3 |
22-11-02 |
|
|
2 six months after |
455 six months after |
0.9 six months after |
Suppose to shot at 3,035'-3,054',
Casing restriction, shot SWTorpedo 21' above |
| Morning
Star |
Hot
Springs, WY |
2002 |
Phosphoria |
Ben-Rayn-33-1 |
978'-994' |
Cased |
0 |
0 |
0 |
20-05-03 |
|
|
0 |
0 |
0 |
Dry well, Pluged |
| Anderson
Oil |
Knox, KY |
2003 |
Big Lime |
Asher Land-8 |
3,360'-3,370' |
O-H |
NA |
12 |
NA |
|
|
|
NA |
39 |
NA |
Listed rates are an open flow. In
line it puts 16 MCFD for last 12 months. |
| Merit Gas
& Oil |
Knox, KY |
2001 |
Artemus
Quadrangle |
Blevins Corey #1 |
1,782'-1,790' |
O-H |
0 |
0 |
0 |
20-03-04 |
|
|
0 |
0 |
0 |
Tepmporary plug has moved about
130' below to the Devonian Shale and some gas has been seen |
| B & J
Oil and Gas |
Droppleman, B.H. - Heirs |
1966 |
Berea |
B-1 |
2,550'-2,568' |
O-H |
4 |
22 |
10 |
13-08-04 |
|
|
20 |
53 |
30 |
Six stroke pump was installed and pumping was
slowdown from 60 BPD of Total fluid to 50 BPD to stop foaming.
Two months after treatment Gas increase additional 15% from 45mcf to 53mcf. |
| B & J
Oil and Gas |
Keeley, Martin, Etal |
1966 |
Berea |
#2 |
2,552'-2,570' |
O-H |
1 |
2 |
1,5 |
13-08-04 |
|
|
0,5 |
4 |
35 |
After treatment rates will be
posted as soon as they will become available |
| Interstate Natural Gas |
Johnson |
2004 |
Berea |
Thelka Coal#2 |
1,470'-1,482' |
Cased |
NA |
1 |
NA |
14-09-04 |
|
|
NA |
143 |
NA |
All rates are open flow.
A measurement was taken right before treatment and 15 minutes after the treatment. |
| J.D.Carty Resources, Inc, |
Magoffin |
2004 |
Big Lime |
Floyd Arnett#1 |
2,090'-2,130' 2,160'- 2,220' |
Cased |
NA |
0 |
NA |
13-09-04 |
|
|
NA |
0 |
NA |
Very low reservoir pressure ~40psi. Wet.
After first shot 600' of water has been taken by the formation and 4 hours late 500' of water did came back.
No signs of improvements. |
| Interstate Natural Gas |
Martin |
2004 |
Big Lime and Berea |
Dollie Cline#1 |
2,092'-2,124' 2,620'-2,640' |
O-H |
NA |
10 |
NA |
14-10-04 |
|
|
NA |
15 |
NA |
After shooting Berea gas show throw 1,100' of water and 100'
of water was taken by the formation. Asumptions are that presure increased from 180psi to ~550psi
Rate will be posted as soon as they will become available |
| Interstate Natural Gas |
Martin |
2004 |
Big Lime and Berea |
Dollie Cline#2 |
2,080'-2,088' 2,100'-2,110' 2,592'-2,600' |
O-H |
NA |
17 |
NA |
14-10-04 |
|
|
NA |
23 |
NA |
After shooting Big Lime gas show throw 1,200' of water.
Asumptions are that presure increased from 190psi to ~570psi Rate will be posted as soon as they will
become available |
| Williams Production RMT Co. |
Campbell WY |
2005 |
Big George Coal Bed Methane |
CORU 42-16-5075B |
1,250'-1,274' |
O-H |
NA |
0 |
30 |
20-04-05 |
|
|
NA |
0 |
75 |
After shooting Big George Coal surprisingly we found
no significant coal filling in the hole and Great over 100% increase in water production as intended. |
| Williams Production RMT Co. |
Campbell WY |
2005 |
Big George Coal Bed Methane |
CORU LOVE 31-21-5075B |
1,421'-1,468' |
O-H |
NA |
0 |
70 |
23-05-05 |
|
|
NA |
0 |
117 |
After shooting Big George Coal, filling of coal was 24ft
all the way to the top of Torpedo head and ~70% increase in water production as intended. |
| Wellington Operating Company |
Larimer CO |
2005 |
Layns |
Kiix 1 |
6,075'-6,087' |
Cased |
0 |
NA |
NA |
20-07-05 |
|
|
25 |
NA |
NA |
Torpedo is shoot in 2,000' of oil. 5 BOPD is registered 2 days later. |
|
|